
New Glenn
Blue Origin’s heavy rocket, with a reusable first stage and seven BE-4 engines.
- Status
- Paused
- First flight
- 2025
- January 16
- Height
- 98 m
- 322 ft
- Diameter
- 7 m
- 23 ft
- Built by
- Blue Origin
- 3
- flights: January 2025, November 2025 and April 2026
- Nov 13, 2025
- first booster landing, launching NASA’s ESCAPADE
- May 28, 2026
- rocket destroyed in an engine test on its pad; return to flight moved to January 2027 (as of November 9, 2026)
New Glenn is Blue Origin’s heavy rocket, named after John Glenn, the first American to orbit Earth. It stands 98 meters tall and 7 meters wide and is rated to carry up to 45 metric tons to low Earth orbit. Seven BE-4 engines, burning liquid methane and liquid oxygen, power the first stage, which is designed to fly at least 25 times and lands on a ship in the Atlantic. The second stage burns liquid hydrogen in two BE-3U engines and is not recovered. The rocket launches from Launch Complex 36 at Cape Canaveral, and its BE-4 engine also powers United Launch Alliance’s Vulcan.
The first New Glenn reached orbit on January 16, 2025, carrying Blue Origin’s Blue Ring Pathfinder, but its booster was lost on the way down. The second, on November 13, 2025, launched NASA’s twin ESCAPADE Mars spacecraft, and its booster landed on the ship. On April 19, 2026, that booster flew again, with all seven engines replaced, and landed again, the first reuse of a New Glenn stage. The upper stage, however, left AST SpaceMobile’s BlueBird 7 satellite in the wrong orbit; an investigation led by Blue Origin and accepted by the Federal Aviation Administration in May traced the problem to a cryogenic leak that froze a hydraulic line.

On May 28, 2026, a New Glenn being readied to launch Amazon Leo internet satellites exploded during an engine test on its pad, badly damaging Launch Complex 36. In August Blue Origin traced the explosion to the main oxygen valve on one of the seven BE-4s and said a small change to the valve would be fitted to existing engines; United Launch Alliance said Vulcan’s BE-4s would get the change too. On November 4, 2026, its chief executive, Dave Limp, told employees that the pad rebuild, slowed by summer weather, had moved New Glenn’s return to flight from the end of 2026 to January 2027. As of November 9, 2026, it had flown three times. It is to launch Blue Origin’s Blue Moon landers for NASA and seven of the national-security missions the Space Force awarded in April 2025 for fiscal 2027 to 2032. In September 2026 NASA added a larger version, New Glenn 9×4, to its launch services contract, without yet ordering a flight.
Where New Glenn appears in the atlas
Sources
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10

